Project Description
Wooden Bridge, Bull Island
The refurbishment of the 152m long Bull Island Bridge involved the stripping & disposal of all existing bridge decking timbers & traverse joists and replacement with new decking timbers. New parapet handrails & longitudinal beams were also installed and repairs to existing timber piles were carried out.
Special Features
– Replace existing timbers to bridge – Bridge open to pedestrian traffic throughout entire project – Replace longitudinal and transverse beams – Identify and replace / repair rotten timbers – Stainless steel dowel bars – All beams spliced into place – Replace all timber decking and kerbs – Replace existing guard rails and handrail
Project Details
PROJECT TYPE
Commercial
LOCATION
Clontarf, Dublin 3
CLIENT
Dublin Port Company
DESIGN TEAM
Jacobs Engineering
Project Video
We bring our ISO 9001:2008 quality certification and commitment to each and every project we operate on.







